1. |
Install the interior junction box.
|
2. |
Install the crash pad lower panel.
|
3. |
Check that all system operates normally.
|
Transaxle Control Module (TCM) Inspection
TCM Problem Inspection Procedure
1.
TEST TCM GROUND CIRCUIT: Measure resistance between TCM and chassis
ground using the backside of TCM harness connector as TCM side c ...
Description
Canister Close Valve (CCV) is normally open and is installed on the canister
ventilation line. It seals evaporative emission control system by shutting the
canister from the atmosphere during ...
Inspection
1.
Check the brake tubes for cracks, crimps and corrosion.
2.
Check the brake hoses for cracks, damage and fluid leakage.
3 ...