1. |
Turn the ignition switch OFF.
|
2. |
Disconnect the CCV connector.
|
3. |
Measure resistance between the CCV terminal 1 and 2.
|
4. |
Check that the resistance is within the specification.
|
5. |
Disconnect the vapor hose connected with the canister from the
CCV.
|
6. |
Connect a vacuum pump to the nipple.
|
7. |
Ground the CCV control line and apply battery voltage to the CCV
power supply line.
|
8. |
Apply vacuum and check the valve operation.
|
Installation
1.
Install the intake CVVT (A) and exhaust CVVT (B).
Tightening torque :
63.7 ~ 73.5 N.m (6.5 ~ 7.5 kgf.m, 47.0 ~ 54.2 lb-ft)
...
Installation
1.
Connect the horn connector, then reassemble the horn.
...
Fender Replacement
•
When removing and installing the fender, an assistant
is necessary.
...