1. |
Measure the pressure of high pressure line by measuring voltage
output between terminal “1” and “2”.
|
2. |
Inspect the voltage value whether it is sufficient to be regular
value or not.
|
3. |
If the measured voltage value is not within specification, replace
the A/C pressure transducer.
|
Radiator: Components
1. Cooling fan & reservoir tank assembly
2. Radiator lower hose
3. Air guard
4. Upper cover
5. Radiator upper hose
6. Filler neck
...
Installation
•
Install the component with the specified torques.
•
...
ECM Terminal And Input/Output signal [A/T]
ECM Terminal Function (A/T)
Connector [EGGA-AG]
Pin No.
Description
Connected to
1
Injector (Cylinder #1) [High] control output
...