Removal
1. |
Remove the fuel pump.
(Refer to Engine Control/Fuel System - “Fuel Pump”)
|
2. |
Remove the roll over valve (A) after releasing hooks (B).
|
Installation
1. |
Install in the reverse order of removal.
|
Special Service Tools
Tool
(Number and Name)
Illustration
Use
09200-3N000
Engine support fixture (Beam)
Removal and installation of the transaxle.
Use t ...
Ignition Switch Assembly Installation
1.
Install the key lock cylinder.
When assembling, the key must be insert ...
AGM Battery: Specification
Item
Specification
Model type
AGM 70L-DIN
Capacity [20HR/5HR] (AH)
70/56
Cold Cranking Amperage (A)
760 (SAE) / 610 (EN)
...