1. |
Wrap tape around the driveshaft spline(TJ) to prevent damage to
the boot.
|
2. |
Using the alignment marks (D) made during disassembly as a guide,
install the spider assembly (A) and snap ring (B) on the driveshaft
splines (C).
|
3. |
Add specified grease to the joint boot as much as it was wiped
away at inspection.
|
4. |
Install the both boot band.
|
5. |
To control the air in the TJ boot, keep the specified distance
between the boot bands when they are tightened.
|
6. |
Using the SST(09495-3K000), secure the TJ boot bands.
|
7. |
Install the Front Driveshaft. (Refer to DS group - “Front Driveshaft”)
|
Torque Converter Control Solenoid Valve (T/CON_VFS) Installation
1.
Installation is the reverse of removal.
•
...
Schematic Diagrams
Circuit Diagram (1)
Circuit Diagram (2)
Circuit Diagram (3)
SRSCM Connector Terminal
Pin
Function (Connector A)
Pin
Function (Connector B)
...
Steering Gear box Components
1. Tie-rod end
2. Lock nut
3. Bellows clip
4. Bellows
5. Tie rod
6. Rack bar
7. Dust packing
8. Dust cap
9. Oil seal
10. Pinion plug
11. Pinion assembl ...