Shift Lever Assembly Replacement |
1. |
Remove the center console.
(Refer to "interior (console)" in BD group)
|
2. |
Disconnect the connector (A)
|
3. |
Remove the control cable (B).
|
4. |
Remove the shift lock cable (A).
|
5. |
Remove the wiring clip (A).
|
6. |
Remove the AT lever(shift lever) assembly (B) by removing the
bolts (4ea).
|
7. |
Installation is the reverse of removal.
Adjust the shift lock cable.
(Refer to "adjustment shift lock cable" in this group)
|
Control Cable Assembly Replacement |
1. |
Remove the center console.
(Refer to "interior (console)" in BD group)
|
2. |
Remove the control cable (A).
|
3. |
Remove the crash pad.
(Refer to "Interior(Crash pad)" in BD group.)
|
4. |
Remove the heater unit.
(Refer to "Heater(Heater unit)" in HA group.)
|
5. |
Remove the retainer (A) and nuts (B).
|
6. |
Remove the nut (A) from the manual control lever.
|
7. |
Remove the control cable (B) from the bracket (C) at transaxle
assembly side.
(Refer to "Automatic Transaxle" in this group)
|
8. |
Remove the control cable at cabin room.
|
9. |
Installation is the reverse of removal.
|
Shift Lock Cable Replacement |
1. |
Remove the center console.
(Refer to "interior(console)"in BD group.
|
2. |
Remove the shift lock cable (A).
|
3. |
Remove the shift lock cable (B) from the brake pedal (A).
|
4. |
Installation is the reverse of removal.
|
Specifications
Purge Control Solenoid Valve (PCSV)
▷ Specification
Item
Specification
Coil Resistance (Ω)
22.0 ~ 26.0 [20°C(68°F)]
Fuel Ta ...
Components Location
1. Battery sensor
2. Brake Booster Vacuum Pressure Sensor (BBVPS)
3. AGM battery
4. DC/ DC Converter (LDC)
5. ISG OFF Switch
6. Alternator
7. Starter
8. Brake s ...
4Door Rear Body
Side outer panel rear corner
Side outer panel rear corner
Side outer panel rear corner
...