1. |
Place the thermostat in the block.
Install the thermostat (B) with the jiggle valve upward.
|
2. |
Install the water inlet fitting (A).
|
3. |
Fill with engine coolant.
|
4. |
Start engine and check for leaks.
|
Sub Frame Replacement
1.
Remove the front wheel & tire.
Tightening torque :
88.3 ~ 107.9N.m(9.0 ~ 11.0kgf.m, 65.1 ~ 79.6lb-ft)
...
Hood switch Installation
1.
Install is reverse of removal.
...
Specification
Smart Key Unit
Items
Specification
Rated voltage
DC 12V
Operating voltage
DC 9 ~ 16V
Operating temperature
-30°C ~ 75°C (- ...